您好Q欢q来到山东中煤工矉K团!

轨枕又称枕木Q也是铁路配件的一U?/strong>

The sleeper is also called the sleepers, but also parts of a railway

只不q现在所用材料不仅仅是木材,因此叫轨枕更加科学?别看轨枕的模样单调划一Q貌不惊人,它的作用可不。轨枕既要支扉K轨,又要保持钢轨的位|,q要把钢轨传递来的巨大压力再传递给道床。它d备柔韧性和Ҏ,了不行QY了也不行。列车经q时Q它可以适当变Ş以缓冲压力,但列车过后还得尽可能恢复原状?/p> Only now, not just the materials used in wood, so called sleeper more scientific. Don't look like uniform monotone sleeper, appearance is not breathtaking, its role can not small. Necessary to support rail sleepers, but also to maintain the rail position, but also to pass the rail pressure before being passed to the ballast. It must have a certain flexibility and elasticity, hard not soft line. After the train, it can be deformed due to buffer the pressure, but after the train had as much as possible restitution.

水惔轨枕也叫混凝土枕
又称
砼枕

Concrete sleeper is also called the concrete pillow,
also known as the concrete sleeper

由؜凝土Q钢{,l合而成Q外表坚,使用寿命?/p> Made of concrete, steel, combination, hard appearance, long service life

水惔枕轨产品分类

Product classification

¸˹vs˹ͼ www.yiftz.com.cn 水惔枕木按照安装方式可分为U型环式和螺栓压板?/p> Concrete sleepers are in accordance with the installation can be divided into U type ring type and plate type bolt

水惔枕木U型环的轨枕安装方便,只需钢轨放C个U型环之间Q下面垫上橡胶垫板,然后用大锤砸下U型环压住钢轨。水泥枕木螺栓压板的是用T型螺栓从轨枕下面预留孔中I出上面固定住压板压住钢轨,一根轨枕需?套螺栓,4个压板,2个橡胶垫板,q种轨枕L方便Q可以重复利用?/p> The cement sleeper sleeper U type ring has the advantages of convenient installation, only the rail put between the two U ring, the following mat rubber pad, and then use a sledgehammer smashing U type ring down rail. The cement sleeper bolt plate is used in T type bolt from the sleeper reserved under the hole above fixed platen presses the rail, a sleeper needs 4 sets of bolt, 4 plate, 2 rubber pad, the sleeper maintenance convenient, can use repeatedly

水惔枕轨产品分类

Product advantage
  • 水惔枕木需要蒸汽脱模一ơ成型,外观光滑Q里面坚,q含有多根螺Uw?/p>

  • 水惔枕木,材源q泛Q规格统一Q弹性均匀Q绝~性好Q稳定性高Q不受天气温度等外在条g的媄响,不腐烂、用寿命长?/p>

  • 预应力؜凝土轨枕除了能大量节U钢材外Q还有用寿命长、轨道稳定性好Q能满高速、大q量要求{优炏V?/p>

水惔枕轨常规规格

General specifications
名称 宽度(mm) 厚度(mm) 长度(mm) 备注
备注 220 160 2500 p16个长度规?/td>
道岔枕木Q普通) 220 160 2600-4850Q以150mmq位 /
道岔枕木Q标准) 240 160 2600-4800Q以200mmq位 p12个长度规?/td>
桥梁枕木 220 240?60?80?00 3000 /

水惔枕轨常规间距

Sleeper spacing

轨枕的间距应Ҏq量、行车速度及道床类型等条g军_。间距较时Q\基、道床、钢轨以及轨枕本w所受作用力均小Q但间距q小则增加工E费用,且媄响道床的捣固作业。轨枕间距一般ؓ52?2厘米。中国铁路一般以每公里铺设轨枕的Ҏ间接昄轨枕间距?/p> Sleeper spacing should be decided according to the vehicle speed and traffic volume, ballast type conditions. Spacing is small, the roadbed, ballast, rail and sleepers are forces suffered their own small, but the spacing is too small to increase the project cost, and the effect of the ballast tamping. Sleeper spacing is generally 52 ~ 62 cm. China Railway General laid per kilometer root number sleeper indirect display sleeper spacing.

水惔枕轨常规间距

The safety rules
  • 轨枕公\q输应用带有固定架的R辆,q输车应与轨枕尺寸相适应Q装车层C多于6层,装R后应l扎牢固Q严防运输途中发生位移?/p>Sleeper road transport should be used with a fixed frame of the vehicle, vehicles should be compatible with the sleeper size, loading layers of not more than 6 layer, after loading shall be bond firmly, prevent the transit of displacement.

  • 轨枕铁\q输应按铁\部门批准的装车方案进行装车?/p>Sleeper railway transportation should loading scheme according to the railway departments approved for loading.

  • 装RӞ每摞轨枕之间塞两块三角楔木,防止轨枕q输q程中碰撞、损坏?/p>When loading, between each stack of sleeper plug two block triangular wedge of wood, to prevent damage during transport collision, sleeper.

  • Q?Q?抬运混凝土枕?Z根;桥枕、岔枕等应增加扛抬h员?/p>(1) carrying a concrete sleeper should be 4 people a pillow, pillow etc.; bridge fork lift personnel should be increased.

  • 轨枕铁\q输应按铁\部门批准的装车方案进行装车?/p>Sleeper railway transportation should loading scheme according to the railway departments approved for loading.

  • Q?Q?抬运轨枕Ӟ挂枕应牢靠,抬运应^EI攄时步调应一致?/p>(2) carrying a sleeper, hanging pillow should be firm, lifted should be smooth, placed when the pace should be consistent.

  • 轨枕铁\q输应按铁\部门批准的装车方案进行装车?/p>Sleeper railway transportation should loading scheme according to the railway departments approved for loading.

  • Q?Q?单h扛运木枕应有固定人员搭肩。到达指定地Ҏ|时Q应先将木枕一端着圎ͼ使木枕竖立,然后放下Q不应耸肩摔掷Q避免碰撞他人?/p>(4) single carry wood should be fixed personnel shoulder. Arrived at the designated location for placement, should first be a sleeper end, make the sleeper is erect, and then down, should not shrug a throw, avoid collisions with others.